Executed by Vital Power & Electrical Works
90-ft Guyed-Mast Tower Dismantling Project – PSO Chakpirana Depot
Project Overview:
Vital Power & Electrical Works successfully executed the complete dismantling of a 90-ft guyed-mast tower at the PSO Chakpirana Depot. This project required highly specialized technical expertise, safety-focused planning, and precise execution to ensure uninterrupted depot operations during the dismantling process.
With our experienced engineers, certified rigging team, and advanced tools, we delivered the project safely, professionally, and within the planned schedule—upholding PSO’s operational and safety standards.
Client
Pakistan State Oil (PSO)
Chakpirana Depot
Project Scope
The project covered full-cycle dismantling of the existing 90-ft guyed-mast communication tower and included the following key activities:
-
Comprehensive site inspection and tower condition assessment
-
Development of a detailed dismantling plan
-
Installation of safety systems and fall-protection equipment
-
Sequential removal of guy wires and stabilizing elements
-
Dismantling of tower segments using specialized rigging equipment
-
Secure lowering of each tower component to the ground
-
Transportation and handover of dismantled material
-
Site cleanup and final safety verification
Challenges & Solutions
1. Maintaining Depot Operations
The depot remained fully operational during dismantling. Our team coordinated closely with PSO management to schedule work in a manner that caused zero disruption.
2. Height & Structural Stability
The 90-ft height and guy-wire supported structure required careful dismantling. We used certified climbing technicians and controlled rigging systems to safely lower each section.
3. Safety Protocols
Strict safety procedures were followed:
-
Use of PPE (helmets, harnesses, gloves)
-
Safety briefing before every shift
-
Controlled perimeter zone to avoid unauthorized access
-
Redundant support systems for tower stability
No safety incidents occurred throughout the project.
Technical Execution
The dismantling process was executed in multiple phases:
Phase 1: Survey & Planning
Our engineers performed a detailed structural survey and developed a step-by-step dismantling plan focusing on:
-
Load distribution
-
Safe removal sequence
-
Wind and weather conditions
-
Material handling logistics
Phase 2: Stabilization & Guy-Wire Removal
Guy wires were released in a controlled sequence to maintain balance. Each step was monitored by rigging supervisors.
Phase 3: Tower Section Removal
The tower was dismantled from top to bottom. Each segment was detached, anchored, and lowered using industrial-grade ropes, pulleys, and rigging tools.
Phase 4: Ground Handling & Disposal
All segments were carefully placed, categorized, and handed over to the client. The site was cleaned and restored to original condition.
Project Completion
The dismantling project was completed:
-
Within the agreed timeline
-
With full safety compliance
-
With zero operational disruption
-
With professional documentation and reporting provided to PSO
This project demonstrates the capability, reliability, and technical strength of Vital Power & Electrical Works in executing high-risk industrial dismantling and electrical infrastructure projects.
Project Highlights
-
90-ft Guyed-Mast Tower Dismantling
-
Certified Rigging & Electrical Team
-
Strict HSE Compliance
-
Zero Accident Report
-
Delivered Within Timeline
Why PSO Chose Us
PSO selected Vital Power & Electrical Works based on our proven expertise in:
-
Industrial tower installation & dismantling
-
Electrical engineering solutions
-
Safe and precise high-altitude technical work
-
Reliable project execution for corporate and industrial clients
The successful completion of this project further strengthens our position as a trusted provider of electrical and technical infrastructure services in Pakistan. Vital Power & Electrical Works continues to deliver high-quality, safe, and dependable solutions for industrial clients across the country.